Actuality: Sugarbeet Harvest is behind Schedule
Date: Mon, 10/02/2023 Broadcast: 12
Remark: USDA meteorologist, Brad Rippey, saying that the pace of the sugarbeet harvest is slower than normal.
Duration: 00:00:40.019
Author: GCRAWFOR
MP3:
Date: Mon, 10/02/2023 Broadcast: 12
Remark: USDA meteorologist, Brad Rippey, saying that the pace of the sugarbeet harvest is slower than normal.
Duration: 00:00:40.019
Author: GCRAWFOR
MP3: